- Installation of technological lines for reinforced concrete sleepers and bars of switch indicators;
- Replacement of technological piping, electrical equipment, lighting;
- Installation of control instrumentation, technological production automation and control means for the steaming chambers;
- Overhaul of cranes with capacity of 15/3 t;
- Recovery of overhead cranes with capacity 32/8 t.
April 2003 - 2005