• Installation of technological lines for reinforced concrete sleepers and bars of switch indicators;
  • Replacement of technological piping, electrical equipment, lighting;
  • Installation of control instrumentation, technological production automation and control means for the steaming chambers;
  • Overhaul of cranes with capacity of 15/3 t;
  • Recovery of overhead cranes with capacity 32/8 t.

April 2003 - 2005