LLC “METINVEST ENGINEERING” 2019-2020
2019-2020 years Reconstruction of LPC-1700 at PJSC “Ilyich Iron and Steel Works”
LLC “METINVEST ENGINEERING” 2019-2020 Читати далі »
2019-2020 years Reconstruction of LPC-1700 at PJSC “Ilyich Iron and Steel Works”
LLC “METINVEST ENGINEERING” 2019-2020 Читати далі »
2018-2020 years Reconstruction of gas purification systems of sintering machines of PrJSC “Ilyich Iron and Steel Works”
LLC “METINVEST ENGINEERING” 2018-2020 Читати далі »
2018-2019 years Overhaul of blast furnace No. 3 at PJSC “MK “AZOVSTAL”
LLC “METINVEST ENGINEERING” Читати далі »
2018-2019 years Construction of continuous casting complex No. 4 at PrJSC “Ilyich Ilyich Casting Plant”
LLC “METINVEST ENGINEERING” 2018-2019 Читати далі »
2017 – 2018 years Dismantling, construction, installation and commissioning of gas purification works at the facility “Reconstruction of gas purification systems of the converter shop of PrJSC
LLC “METINVEST ENGINEERING” 2017-2018 Читати далі »
2017 year PJSC “Ukrgrafit” – project for the reconstruction of the existing workshop with the installation of longitudinal graphitization furnaces:
PJSC “Ukrgrafit” Читати далі »