• mechanical erection;
  • piping erection;
  • anticorrosion protection and insulation of equipment and piping;
  • E and I scope;
  • accompanying of commissioning works.

 

2014-2015

Linde 1 sm  Linde 2 sm   Linde 4 sm  

  • equipment erection;
  • piping erection;
  • instruments installation.

2011-2012

Dry Laundry Detergent Plant Construction Project

  • Carbon steel and stainless steel equipment fabrication;
  • Process equipment erection;
  • Piping installation;
  • Electrical erection works;
  • Regular maintenance and reconstruction.

2011 - 2013

  • reconstruction of the existing industrial boiler house with expansion for the unit for processing of the battery production waste;
  • process equipment erection.

2010 - 2012

  • Piping installation of the concrete mixing unit;
  • Fabrication and installation of pneumatic transport for concrete and steel structures at the height of 25m.

2007-2008

  • Production unit and everyday premises lighting installation;
  • Cable structures installation;
  • Control and power cables laying;
  • Fabrication and installation of the accumulation bins.

2006

 

 

  • Fabrication of non-standard equipment;
    Repair of lifting equipment.