Equipment fabrication for export:
- Stainless steel screw conveyors;
- Stainless steel and carbon steel chain conveyors;
- Belt conveyors;
- Norias;
- Stainless steel piping assemblies;
- Stainless steel sieves and supporting structures for sieves;
- Stainless steel air valves;
- Stainless steel tanks;
- Silos.
2017 – 2018
Oil Extraction Plant reconstruction:
- Fabrication of non-standard equipment and steel structures;
- Mechanical erection;
- Piping erection;
- E&I installation;
- Commissioning works accompanying.
2017 – 2018
- Fabrication of non-standard equipment
- Mechanical erection
- Piping erection
- E & I works
- Accompanying of commissioning works
2016
New Grain Terminal of Noble Group company Nokilaev Sea Port
- Fabrication of non-standard equipment
- Mechanical erection
- Accompanying of commissioning works
2015-2016
Construction of vegetable oil transshipment terminal (I-st stage of the project) 2013
2013
Construction of large oil extraction plant –processing of sunflower, soya & rape (II-nd stage of the project) 2014-2015
- non-standard equipment fabrication;
- fabrication and erection of tanks;
- mechanical erection;
- piping installation;
- E & I scope;
2014 - 2015
- for malt plants in Vitry, France and Kloosterzande, the Netherlands (turner, different configuration tanks, conveyers: belt, chain, cable & slat) ;
2013 - 2014
- erection of malt plant equipment in Kloosterzande, the Netherlands.
2014 - 2015
- installation of process equipment & piping;
- erection of aspiration, ventilation system & ducting;
- dismantling and re-installation of heaters;
- process equipment maintenance up to the present time.
2004 – up to now
- outdated equipment dismantling;
- process equipment erection: toasters, presses, extractor, screw and belt conveyers, hulls pelettizer;
- non-standard equipment fabrication;
- E & I scope;
- regular maintenance & reconstruction.
1998 - up to now
- installation of process equipment, lifting equipment, electrical equipment, control instrumentation, piping;
- fabrication and installation of steel structures, ducting;;
- preparation unit equipment erection (Alocco);
- extraction unit equipment erection (Desmet Ballestra);
- E & I scope;
- hulls pelletizing unit equipment erection.
2005 - 2007
- mechanical erection;
- piping installation;
- E & I scope;
- accompanying of commissioning works.
2014 - 2016
- non-standard equipment fabrication;
- steel structures & mechanical erection;
- silos mounting;
- piping installation;
- E & I scope;
- automation;
- accompanying of commissioning works.
2012 - 2013