2005 – 2006 years
➣ installation of technological equipment, electrical equipment;
➣ installation of the first firing furnace, installation of the main and two bypass threads for moving the cart;
➣ manufacture of a cart for loading and unloading;
➣ manufacture and installation of metal structures, gas ducts.
