CJSC “Nadiya”, Kryvyi Rih. Yeast production plant

2005-2007 years

  • installation of technological equipment, pipelines, electrical equipment and instrumentation;
  • fabrication and installation of metal structures;
  • electrical installation of treatment plant equipment.
Scroll to Top