September 2003 – 2004.
➣ installation of technological equipment;
➣ installation of ventilation and aspiration systems;
➣ construction, installation and commissioning works;
➣ reconstruction of the drying department
September 2003 – 2004.
➣ installation of technological equipment;
➣ installation of ventilation and aspiration systems;
➣ construction, installation and commissioning works;
➣ reconstruction of the drying department