Metallurgical industry

LLC “METINVEST ENGINEERING” 2019-2020
2019-2020 years Reconstruction of LPC-1700 at PJSC “Ilyich Iron and Steel Works”

LLC “METINVEST ENGINEERING” 2018-2020
2018-2020 years Reconstruction of gas purification systems of sintering machines of PrJSC “Ilyich Iron and Steel Works”

LLC “METINVEST ENGINEERING”
2018-2019 years Overhaul of blast furnace No. 3 at PJSC “MK “AZOVSTAL”

LLC “METINVEST ENGINEERING” 2018-2019
2018-2019 years Construction of continuous casting complex No. 4 at PrJSC “Ilyich Ilyich Casting Plant”

LLC “METINVEST ENGINEERING” 2017-2018
2017 – 2018 years Dismantling, construction, installation and commissioning of gas purification works at the facility “Reconstruction of gas purification systems of the converter shop of PrJSC “MK “Azovstal”.

PJSC “Ukrgrafit”
2017 year PJSC “Ukrgrafit” – project for the reconstruction of the existing workshop with the installation of longitudinal graphitization furnaces:

SMS Group (Germany)
2015 – 2016 years Manufacturing of non-standard equipment for PJSC “ArcelorMittal Kryvyi Rih”

Danieli Heavy Machinery Engineering (Italy)
2014 – 2015 y. Installation of a four-girder overhead crane for PJSC “ArcelorMittal Kryvyi Rih”

LLC “INTERPIPE NIKO TUBE” Nikopol.
2012 year Project for the installation of a new ring kiln: