Zaporizhzhia Plant of Reinforced Concrete Sleepers, Zaporizhzhia

April 2003 – 2005

➣ installation of technological lines for the production of railway sleepers and switch beams;
➣ replacement of technological pipelines, electrical equipment, lighting;
➣ installation of instrumentation and control; APCS of steaming chambers;
➣ overhaul of cranes g/p 15/3 t.;
➣ restoration of bridge cranes g/p 32/8 t.

Scroll to Top